11/23/16 Comment Period on Michael Ades Residential and Office/R&D Development Reply

11/23/16 Comment Period on Michael Ades Residential and Office/R&D Development

The MEPA comment period is open on the proposed Michael Ades development at 5 Middlesex Avenue in Assembly Square (EEA# 15595). This development is on the site of the existing office building and includes in phase 1 a five-story hotel and residential building with ground floor retail and in phase 2 a 14-story mixed-use building with office and lab space. There are two additional phases as well that include more office/R&D and residential space. The project is estimated to add 18,535 new vehicle trips per day.

The comment period ends November 23, 2016. Submit comments to:

Matthew A. Beaton, Secretary
Executive Office of Energy and Environmental Affairs
MEPA Office, Attn: Holly Johnson, MEPA Analyst
EEA number #15595
100 Cambridge Street, Suite 900
Boston MA 02114

Via e-mail: holly.s.johnson@state.ma.us

For more information, see the Environmental Notification Form:

The time for influencing this development is now.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s