6/6/13 MassDOT Design Meeting on McGrath Highway Bridge over Gilman Street 1

6/6/13 MassDOT Design Meeting on McGrath Highway Bridge over Gilman Street

Thu. Jun. 6 6:30 – 8:30 PM

Michael Capuano Early Childhood School
150 Glen St.
Somerville MA (map)

Public Notice (PDF)

The Massachusetts Department of Transportion is holdling a design meeting to discuss replacing the existing three-span bridge carrying McGrath Highway over Gilman Street with a single-span bridge.

Proposal is to replace the existing three-span bridge with a one-span bridge. Two sidewalks are proposed, and a section of Gilman Street will be reconstructed. Acquisitions and easements may be required.

For more information, see MassDOT Accelerated Bridge Program.

WITI?

One comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s